buntingarchitects
buntingarchitects. All rights reserved.
St. John Rigby RC Primary
New Classroom Block - Bedford
A new freestanding block with 6 classrooms, hall, stairs,
toilets and storage facilities. Modular construction techniques
were harnessed to enable most of the work to be done off
site and delivered to enable the works to be carried out
during the summer term with minimal disruption to the school
• Steel modular off - site construction
• Fibre cement panel cladding
• Underfloor heating through out
• Natural ventilation to hall and classrooms
• Awning covered deck to playground edge
• Highly insulated construction with low air leakage achieved
The client required the facilities to expand their existing lower
school structure to enable transition to a full primary school
to enable the shift from 3 tier to 2 tier education throughout
the Borough of Bedford.
Key Features: